DETERMINATION OF ANNUAL PROFIT AND FORESEEABLE LOSSES IN CONSTRUCTION CONTRACT
1 Author(s): DR RACHNA GARG
Vol - 5, Issue- 8 , Page(s) : 158 - 167 (2014 ) DOI : https://doi.org/10.32804/CASIRJ
The peculiarity in construction contract business is that the work is spread over a number of years and the question of determining profits there from on an annual basis bristles with difficulties. In contracts relating to construction of multi-storeyed building, bridges, dams, ships, etc., which entail operations for a number of years, a problem arises as to the allocation of revenues and related costs to various accounting periods over the duration of the contract.